  • 本站编辑:临夏州环东建材有限公司临夏县分公司发布日期:2018-06-24 18:46 浏览次数:

斜三通

阳台、雨罩安装落水管时水落口制作与安装

Installation and installation of water rake for balcony and rain cover installed downpipe

按照设计要求,划线下料,核对尺寸无误后,做出实样,上下应做出承插口,上口应在抹水泥砂浆前安装固定,下口应安装在立管预留的接口内,并进行焊接。安装前应清除锈斑,用抹布擦净后刷上防锈漆,如采用镀锌铁板制作时,要在管内外涂刷锌磺类或磷化底漆,调和漆宜在安装稳固后,与主管同时涂刷。

According to the design requirements, underline material, check the size without error, make real samples, up and down should make socket, the upper mouth should be installed in front of the cement mortar fixed, the lower mouth should be installed in the riser in the interface, and welding. Before installation, rust stains should be removed, and the rust paint is painted with a rag. If galvanized iron plate is used, zinc or phosphating primer should be painted inside and outside the tube, and the paint should be brushed at the same time after the installation is stable.

凡屋面、檐口、檐沟、斜沟、泛水及水落斗(管)用镀锌薄板制作时,其厚度应按0.45~0.75要求,并应经过风化或涂刷专用的锌磺类和磷化底漆,再涂刷罩面漆;如选薄钢板制作时,成形后应在其两面涂刷红丹油或铁丹油后,再刷两道罩面漆。

When the roof, eaves, eaves, eaves, slanting gully, water and water bucket (pipe) are made of galvanized sheet, the thickness should be 0.45 to 0.75, and a special zinc sulphur and phosphating primer should be weathered or painted and then painted with the cover paint. Brush two cover lacquer.